|
The Seli Hydroelectric Plant aims to provide of hydro electric power in Lahaul & Spitidistrict, Himachal Pradesh, India. The project has been awarded to Moser Baer through the international competitive bidding process. The project component comprises a concrete gravity dam of about height above river bed level with two head race tunnels of approximately 4.2 km and an underground powerhouse complex on the right bank of river Chenab. Power would be generated by harnessing average gross head between intake and tail race location.〔(【引用サイトリンク】url=http://www.tractebel-engineering-gdfsuez.com/reference/seli-hydro-electric-project/ )〕 ==Project objectives== The Project shall provide: *Peaking power *Renewable energy which helps reduce carbon emissions *Development of remote areas in higher reaches *Sustainable business and lowering cost of generation of electricity 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Seli Hydroelectric Plant」の詳細全文を読む スポンサード リンク
|